Room configuration

3D layout for the workshop scenario — 6.0 × 4.5 × 2.7 m. Drag a mic along +X (0.25 m snap); drag empty space to orbit; scroll to zoom.

Microphone spacing

M1 and M2 stay on a line parallel to +X at y=2.25, z=1.20 m. Drag either mic in the 3D view — each snaps to a 0.25 m grid. The slider sets separation while keeping the current pair midpoint.

0.25 m (25 cm)

Axes: +X length (red), +Y width (green), +Z height (blue). Origin at southwest floor corner.

Positions (meters)

ID Role x y z
M1 Microphone 1 2.00 2.25 1.20
M2 Microphone 2 2.20 2.25 1.20
S1 Speech (Rainbow Passage) 1.40 3.60 1.55
S2 Metal grinder 5.10 1.20 0.95
  • Mic spacing: 0.25 m (25 cm)
  • S1 → array mid: 1.56 m
  • S2 → array mid: 3.19 m
  • T60 target: 0.40 s

Speech + grinder demos use geometry-aware short FIRs (direct-path ITD + 1/r) from these mic positions. Full image-source RIRs are still planned separately.

Use layout in demo